Pims databases that have been archived


A list of archived Pims databases are also available in the Omega cloud, but access to these read-only databases are restricted.
If you need access to data in any of the archived Pims instances/databases please contact pimscoordinator@akerbp.com
Details about each individual archived Aker BP Pims version can be found below.

PS! These archived databases requires users to be connected to the Aker BP network directly.
Will not work over Cisco VPN (e.g. using Aker BP laptop from home). If connecting from remote
you need to use "Google Chrome TS" or "Microsoft Edge TS" on the Aker BP Citrix soluton: https://access.akerbp.com to connect to the Aker BP Pims.


Pims version Old Pims web address Link to launch the archived Pims database Information about this archive
R4 pims.detnor.no https://r4dn.pimshosting.com/install/ This was the main Pims database used at Det Norske AS for:
- Alvheim Drift
- Ivar Aasen Development Project
- Viper-Kobra
R4 cms.detnor.no https://cms-dn.pimshosting.com/install/ This was the Pims CMS database used at Det Norske AS for the Ivar Aasen project.
- Det norske oljeselskap ASA
R3 R3 WinClient only Data from old DB can be exported on request This was the first Pims database used at Det Norske AS for:
- Draupne-FEED (Ivar Aasen Development: pre-PDO phase)
- CompanyRisks
- Draupne (Ivar Aasen Development Project)
- Jetta (Jette Development project)
WEB https://pmcs.akerbp.com/ https://pmcs.akerbp.com/ This was the Pims PMCS database used at BP Norge for:
- Crestal Gas Lift
- Hod Re-Development Project
- Life of Field Seismic
- NS BPN Cat. C – Portfolio
- NS BPN Cat. C – Skarv
- NS BPN Cat. C – Ula
- NS BPN Cat. C – Valhall
- Oda Tie-in to Ula
- Skarv Well Annuli Pressure Management (SWAPM)
- Snadd
- Tambar Artificial Lift
- Ula F&G Upgrade Project 1 (P)
- Ula F&G Upgrade Project 2 (QD)
- Ula Flare Integrity Project
- Valhall 2/4G Decomm
- Valhall DP P&A Prep
R4 & Web pims.lnas.no https://lnas-pims.akerbp.com/

The WinClient for this can be installed from here:
https://lnas-pims.akerbp.com/winclient
This was the main Pims database used at Lundin Energy for:
- Edvard Grieg Tiebacks phase 1
- Edvard Grieg power from shore
- Edvard Grieg Boiler
- IOR

Also has access to documents and the compliance module from the Lundin Pims R4.
R4 & Web cms.lnas.no https://lnas-cms.akerbp.com/

The WinClient for this can be installed from here:
https://lnas-cms.akerbp.com/install2
This was the Lundin Energy Pims CMS database used for Edvard Grieg